# Israel Securities Authority: New Reporting Rules for the Renewable Energy Sector

*A new draft guide published for public comment details the information companies in the sector will be required to disclose in prospectuses • Among other things, they will present data on projects, investments, technologies and electricity tariffs*

- Published: 2026-11-01T14:57:08.311Z (Sunday, November 1, 2026)
- Updated: 2026-11-16T08:33:40.703Z
- By: Alma Tal Tzur
- Section: Energy
- Canonical: https://tv10.news/news/energy-infrastructure/energy/126595/isa-new-reporting-rules-renewable-energy-sector/
- Hebrew original (TV10): https://tv10.co.il/news/environment/energy/126595/
- Publisher: TV10 Global (TV10, Israel’s economic channel). Translated from Hebrew with AI and an automated accuracy check.

The Israel Securities Authority (ISA) published today (Sunday) for public comment a draft guide on information disclosure in prospectuses issued by companies in the renewable energy sector. The guide is intended to establish a uniform format for presenting information about the companies’ activities, with the aim of improving the information available to investors and enabling easier comparisons among corporations in the sector.

The guide is intended to consolidate the relevant disclosure requirements and serve as an aid to companies in preparing prospectuses. It combines aggregate information about a corporation’s activities with details on particularly material projects and groups of projects at various stages of development, allowing investors to assess the scope of activity, economic potential and associated risks.

![Renewable energy](https://tv10.news/media/2026/11/f6/f6c94906164f1279a74568349c9e81e88a98d78ede924c852bc8b1b35a645bac.jpg)

Renewable energy | Photo: Shutterstock

Among the subjects on which companies will be required to report are the technologies they use, the geographic location of the projects, business, financing and regulatory conditions, the progress of all projects and the scope of investments made in them.

In addition, companies will be required to present quantitative and qualitative data on material projects and groups of projects, broken down by their stages of progress: projects already operating commercially, those ready for connection, projects under construction or nearing construction, and projects at various development stages.

Companies will also be required to detail their energy sales models and electricity tariffs, how the projects are constructed and the principal licensing procedures, as well as information on grants, tax benefits and projected results.
